PROJECTS

Our projects from 1998 until today

2021
INSTALLATION AND INTERCONNECTION OF ELECTRICAL PANELS, PERIPHERAL EQUIPMENT, LEVEL METERS AND DATA LOGGERS IN THE WATER SUPPLY NETWORK OF THE MUNICIPAL WATER AND SEWERAGE COMPANY OF AIGIALEIA IN THE MUNICIPALITY OF AGIOS VASILEIOS
SUPPLY, INSTALLATION, TESTING AND PREPARATION OF DRAWINGS AT THE WASTE TREATMENT UNIT (M.E.A.) OF THE 2ND MUNICIPAL UNIT OF VIOTIA REGIONAL UNIT
INSTALLATION AND CONNECTION OF SPECIAL MV-LV-1 C CABLES, CABLE TRAYS, AND F.O. CABLES IN THE PROJECT CONSTRUCTION OF A NEW ELECTRIC POWER GENERATION UNIT IN AGIOS NIKOLAOS, PARALIA DISTOMOU, VIOTIA
SUPPLY OF BATTERIES FOR SOLAR-POWERED LIGHTING FIXTURES IN THE MUNICIPALITY OF FOURNOI KORSEON
REPAIR WORKS FOR THE SEAWATER PUMPING STATION AT THE PEACE AND FRIENDSHIP STADIUM IN NEO FALIRO, ATHENS
SUPPLY OF ELECTRICAL PANELS TO THE WASTE TREATMENT UNIT OF THE 2ND MUNICIPAL UNIT OF VIOTIA REGIONAL UNIT
SUPPLY OF TELEMETRY SYSTEM, LEAKAGE CONTROL, ENSURING SUFFICIENCY AND QUALITY OF WATER NETWORK OF KYMI ALIVERIO MUNICIPALITY
2020
SUPPLY, INSTALLATION AND COMMISIONING OF THE ELCTROMECHANICAL EQUIPMENT AND INSTRUMENTS AT THE WASTEWATER TREATMENT FACILITY IN XYLOKASTRO, CORINTHIA
SUPPLY AND INSTALLATION OF VENTILATOR FOR THE ODOUR TREATMENT SYSTEM OF SEWAGE PUMPING STATION “E” IN LIMASSOL, CYPRUS
ELECTRICAL INSTALLATIONS AT THE MUNICIPAL BULDING – FORMER COMMUNITY HOTEL AT THE LOCATION PIPERI IN NAOUSA, PAROS ISLAND