PROJECTS

Our projects from 1998 until today

2021
November

DESIGN AND CONSTRUCTION OF NEW CELL IN THE LANDFILL OF PAPHOS, CYPRUS (IN PROGRESS)

November

ELECTRICAL WORKS ON THE NEW COMBINED CYCLE ELECTRICAL POWER GENERATION UNIT (CCGT – PPII) AT VIOTIA DISTOMO (IN PROGRESS)

August

REPAIR WORKS FOR THE SEAWATER PUMPING STATION AT THE PEACE AND FRIENDSHIP STADIUM IN NEO FALIRO, ATHENS (IN PROGRESS)

March

SUPPLY OF TELEMETRY SYSTEM, LEAKAGE CONTROL, ENSURING SUFFICIENCY AND QUALITY OF WATER NETWORK OF KYMI ALIVERIO MUNICIPALITY

2020
September

SUPPLY, INSTALLATION AND COMMISIONING OF THE ELCTROMECHANICAL EQUIPMENT AND INSTRUMENTS AT THE WASTEWATER TREATMENT FACILITY IN XYLOKASTRO, CORINTHIA

August

SUPPLY AND INSTALLATION OF VENTILATOR FOR THE ODOUR TREATMENT SYSTEM OF SEWAGE PUMPING STATION “E” IN LIMASSOL, CYPRUS

August

ELECTRICAL INSTALLATIONS AT THE MUNICIPAL BULDING – FORMER COMMUNITY HOTEL AT THE LOCATION PIPERI IN NAOUSA, PAROS ISLAND (IN PROGRESS)

July

SUPPLY AND INSALLATION OF A PRESSURE RELIEF VALVE AT THE “H” PUMPING STATION AND UPGRADE OF THE DISCHARGE PIPES AND HYDRAULIC EQUIPMENT IN TWO PUMPS AT THE “C” PUMPING STATION IN LIMASSOL

June

CONSTRUCTION OF PUMPING STATION Z AND ASSOCIATED PIPELINES AND OPERATION AND MAINTENANCE OF PUMPING STATION Z, LIMASSOL, CYPRUS (IN PROGRESS)

May

DISMANTLING OF THE EXISTING PIPES AND PUMPS AND SUPPLY AND INSTALLATION OF NEW ONES AT THE SEWAGE PUMPING STATION OF THE MATERNAL HOSPITAL “REA”

April

SUPPLY AND INSTALLATION OF LOW VOLTAGE ELECTRICAL PANELS AT THE SOLID WASTE TREATMENT FACILITY IN THEBES, VIOTIA (IN PROGRESS)

April

SUPPLY AND INSTALLATION OF A PRE-ASSEMBLED WASTEWATER PUMPING STATION AT THE PLANT NURSERY IN THE MUNICIPALITY OF ATHENS, FOR THE ATHENS WATER SUPPLY AND SEWARAGE COMPANY (EYDAP S.A.) FOR THE PURPOSES OF THE NEXT-GEN RESEARCH PROGRAM

March

ELECTRICAL AND MECHANICAL INSTALLATIONS AT THE BIOLOGICAL TREATMENT UNITY OF THE SOLID WASTE TREATMENT FACILITY IN THEBES, VIOTIA (IN PROGRESS)

2019
November

ELECTRICAL INSTALLATIONS AT THE SOLID WASTE TREATMENT PLANT IN THEBES, VIOTIA

November

SUPPLY, INSTALLATION AND COMMISIONING OF THE REMOTE CONTROL AND LEAKAGE DETECTION NETWORK OF THE WATER SUPPLY SYSTEM IN THASOS (IN PROGRESS)

October

SUPPLY OF STAND-ALONE PHOTOVOLTAIC MAST AND MOUNTED LIGHTING AT THE MUNICIPALITY OF FOURNOI KORSEON IN THE DISTRICT OF SAMOS

October

EXPANSION OF THE LEACHATE TREATMENT FACILITY AT THE LANDFILL OF ANO LIOSIA AND THE LANDFILL OF FYLI

May

DESIGN, CONSTRUCTION AND OPERATION OF Α SEWARAGE TREATMENT PLANT AND 60 PUMPING STATIONS IN SOLEA, LIMASSOL, CYPRUS (IN PROGRESS)

April

MAINTENACE OF THE PUMPS AT THE STADIUM OF PEACE AND FRIENDISHIP IN ATHENS

April

CONSTRUCTION OF THE MEDIUM AND LOW VOLTAGE ELECTRICITY SUBSTATION IN SPETSOPOULA ISLAND

April

TERMINATION AND CERTIFICATION OF OPTICAL FIBRES OF 8 FIBRES AT THE FACILITY FOR THE PRODUCTION OF FEED “NEUVO” IN SCHIMATARI IN THE DISTRICT OF VIOTIA

2018
September

REPAIRS OF THE ELECTROMECHANICAL EQUIPMENT AT THE WASTEWATER TREATMENT PLANT IN THASOS

May

ELECTROMECHANICAL WORKS AT THE VASILIKOS POWER STATION, PHASE IV, UNIT 5 OF THE COMBINED CYCLE GAS TURBINE PLANT, CYPRUS

2017
December

UPGRADE OF THE POWER COLLECTION SYSTEM AT THE ACCOMONDATION CENTRE IN ELEONAS

August

DESIGN, SUPPLY AND INSTALLATION OF THE ODOUR TREATMENT SYSTEM FOR THE PUMPING STATION “H”, LIMASSOL, CYPRUS

2016
October

ELECTRICAL CONSTRUCTIONS FOR THE LIQUEFIED NATURAL GAS (LNG) IMPORT AND RE-GASIFICATION FACILITY IN DELIMARA, MALTA

August

CONSTRUCTION OF THE NEW FIRE FIGHTING SYSTEM AND DISMANTLING OF THE OLD ONE AT THE “INTERSPORT” STORE IN THESSALONIKI

June

ELECTROMECHANICAL WORKS AT THE WASTEWATER TREATMENT PLANT IN ADDIS ABABA, ETHIOPIA

April

CONSTRUCTION OF AN IMPERMEABLE LAGOON OF 25.000 m3 CAPACITY FOR THE TEMPORARY STORAGE OF RAW LEACHATES AND CONNECTION TO THE PROCESSING UNIT OF LEACHATES IN THE LOCATION “KLEFTIKA-ERITHRA KAMELI” IN THE AGGLOMERATION OF MAVRORACHI OF THE LOCAL COMMUNITY OF KARTERA, IN THE MUNICIPALITY OF LAGADA IN THE NORTH THESSALONIKI – ELECTROMECHANICAL WORKS

April

ELECTRICAL WORKS FOR THE LIGHTING, GROUNDING AND FIRE DETECTION SYSTEM OF DELIMARA’S LNG REGASIFICATION TERMINAL IN MALTA

2015
September

OPERATION AND MAINTENANCE AT THE LANDFILL IN PAPHOS

April

UPGRADE INSTALLATIONS OF THE FIRE FIGHTING SYSTEM IN THE “LEROY MERLIN” STORE IN PIREOS AVENUE – REPLACEMENT OF THE FORMER SYSTEM AND REINSTALLATION OF THE NEW ONE

April

ELECTROMECHANICAL WORKS FOR THE CONSTRUCTION OF 7 WASTEWATER TREATMENT PLANTS IN ETHIOPIA

2014
October

ELECTROMECHANICAL WORKS AT THE WASTEWATER TREATMENT PLANT IN FERES

March

RESTORATION OF THE SITE FOR THE UNCONTROLLED DISPOSAL OF WASTE IN PAPHOS, CYPRUS

2013
December

SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATE OUTPUT OF 1009,80KWp IN STABLE SUPPORT SYSTEM IN GIURGIU, ROMANIA

November

SUPPLY AND INSTALLATION OF ELECTROMECHANICAL EQUIPMENT IN THE PREFABRICATED (compact) WASTEWATER TREATMENT PLANT IN MONODRI IN THE MUNICIPALITY OF KYMI – ALIVERI

November

MAINTENACE AND SMOOTH OPERATION SUPERVISION OF THE PHOTOVOLTAIC FACILITY OF 499,80 KW POWER IN THE LOCATION “PERDIKOULA”, MUNICIPALITY OF LIVADIA (IN PROGRESS)

October

INSTALLATION FOR THE REMOVAL OF MANGANESE, IRON OXIDE AND OPACITY OF POTABLE WATER OF THE PREFECTURE OF VYSSA, MUNICIPALITY OF ORESTIADA

September

DAMAGE RECTIFICATIONS OF THE WATER SUPPLY SYSTEM IN THE MUNICIPAL COMMUNITY OF PSACHNA AND THE LOCAL COMMUNITY OF KASTELLA –NEOTRIVIAS

May

RESTORATION OF THE FIRE FIGHTING SYSTEM IN THE IKEA IN THESSALONIKI (CONSTRUCTION OF THE SYSTEM OF FIRE CABINETS WITH HORSE RACK, SPRINKLERS AND FIRE FIGHTING PUMPS)

May

OPERATION, MAINTENANCE AND SUPERVISION OF THE PHOTOVOLTAIC INSTALLATION OF RATED OUTPUT 499,80 KW IN THE LOCATION “PERDIKOULA – AG.ATHANASIOS” OF THE MUNICIPALITY OF LIVADEIA, PREFECTURE OF VIOTIA

April

REPAIR OF THE LIFTING, SCREENING, SETTLING AND DRYING UNITS ΑΤ THE WASTEWATER TREATMENT PLANT IN ALIVERI

March

SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATE OUTPUT 1009, 80KWP IN STABLE SUPPORT SYSTEM, IN THE TOWN GIURGIU, ROMANIA

March

CONSTRUCTION OF THE HYDRAULIC SYSTEM MADE OF HDPE Φ160-315 mm IN THE REFINERY IN AGIOI THEODOROI

February

MAINTENACE AND SMOOTH OPERATION SUPERVISION OF THE PHOTOVOLTAIC FACILITY OF 999,06 KW POWER IN GIURGIU, ROMANIA (IN PROGRESS)

February

ELECTROMECHANICAL WORKS, PLANTING, INSTALLATION OF GEOSYNTHETIC MATERIALS (GCL, GEOTEXTILES) FOR THE RESTORATION PROJECT AT THE LANDFILL IN PAPHOS

January

SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATED OUTPUT OF 67,000 KWp IN STABLE SUPPORT SYSTEM IN THE LOCATION “GOULIERI 1” AND “GOULIERI 2” IN THE LOCAL COMMUNITY OF KAVALLOURI, MUNICIPAL SECTION OF ESPERIES, MUNICIPALITY OF KERKYRA, REGION OF IONIAN ISLANDS

January

CONSTRUCTION OF A LANDFILL SITE AT THE INTEGRATED WASTE MANAGEMENT FACILITY OF NORTH-EAST ATTICA AT THE LOCATION “MAVRO VOUNO GRAMMATIKOU”

2012
November

SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS OF RATED OUTPUT 499,80 KWp IN STABLE SUPPORT SYSTEM IN THE POSITION “PERDIKOULA” IN THE MUNICIPALITY OF LIVADEIA, REGIONAL ENTITY OF VIOTIA