PROJECTS
Our projects from 1998 until today
2021
DESIGN AND CONSTRUCTION OF NEW CELL IN THE LANDFILL OF PAPHOS, CYPRUS (IN PROGRESS)
ELECTRICAL WORKS ON THE NEW COMBINED CYCLE ELECTRICAL POWER GENERATION UNIT (CCGT – PPII) AT VIOTIA DISTOMO (IN PROGRESS)
REPAIR WORKS FOR THE SEAWATER PUMPING STATION AT THE PEACE AND FRIENDSHIP STADIUM IN NEO FALIRO, ATHENS (IN PROGRESS)
SUPPLY OF TELEMETRY SYSTEM, LEAKAGE CONTROL, ENSURING SUFFICIENCY AND QUALITY OF WATER NETWORK OF KYMI ALIVERIO MUNICIPALITY
2020
SUPPLY, INSTALLATION AND COMMISIONING OF THE ELCTROMECHANICAL EQUIPMENT AND INSTRUMENTS AT THE WASTEWATER TREATMENT FACILITY IN XYLOKASTRO, CORINTHIA
SUPPLY AND INSTALLATION OF VENTILATOR FOR THE ODOUR TREATMENT SYSTEM OF SEWAGE PUMPING STATION “E” IN LIMASSOL, CYPRUS
ELECTRICAL INSTALLATIONS AT THE MUNICIPAL BULDING – FORMER COMMUNITY HOTEL AT THE LOCATION PIPERI IN NAOUSA, PAROS ISLAND (IN PROGRESS)
SUPPLY AND INSALLATION OF A PRESSURE RELIEF VALVE AT THE “H” PUMPING STATION AND UPGRADE OF THE DISCHARGE PIPES AND HYDRAULIC EQUIPMENT IN TWO PUMPS AT THE “C” PUMPING STATION IN LIMASSOL
CONSTRUCTION OF PUMPING STATION Z AND ASSOCIATED PIPELINES AND OPERATION AND MAINTENANCE OF PUMPING STATION Z, LIMASSOL, CYPRUS (IN PROGRESS)
DISMANTLING OF THE EXISTING PIPES AND PUMPS AND SUPPLY AND INSTALLATION OF NEW ONES AT THE SEWAGE PUMPING STATION OF THE MATERNAL HOSPITAL “REA”
SUPPLY AND INSTALLATION OF LOW VOLTAGE ELECTRICAL PANELS AT THE SOLID WASTE TREATMENT FACILITY IN THEBES, VIOTIA (IN PROGRESS)
SUPPLY AND INSTALLATION OF A PRE-ASSEMBLED WASTEWATER PUMPING STATION AT THE PLANT NURSERY IN THE MUNICIPALITY OF ATHENS, FOR THE ATHENS WATER SUPPLY AND SEWARAGE COMPANY (EYDAP S.A.) FOR THE PURPOSES OF THE NEXT-GEN RESEARCH PROGRAM
ELECTRICAL AND MECHANICAL INSTALLATIONS AT THE BIOLOGICAL TREATMENT UNITY OF THE SOLID WASTE TREATMENT FACILITY IN THEBES, VIOTIA (IN PROGRESS)
2019
ELECTRICAL INSTALLATIONS AT THE SOLID WASTE TREATMENT PLANT IN THEBES, VIOTIA
SUPPLY, INSTALLATION AND COMMISIONING OF THE REMOTE CONTROL AND LEAKAGE DETECTION NETWORK OF THE WATER SUPPLY SYSTEM IN THASOS (IN PROGRESS)
SUPPLY OF STAND-ALONE PHOTOVOLTAIC MAST AND MOUNTED LIGHTING AT THE MUNICIPALITY OF FOURNOI KORSEON IN THE DISTRICT OF SAMOS
EXPANSION OF THE LEACHATE TREATMENT FACILITY AT THE LANDFILL OF ANO LIOSIA AND THE LANDFILL OF FYLI
DESIGN, CONSTRUCTION AND OPERATION OF Α SEWARAGE TREATMENT PLANT AND 60 PUMPING STATIONS IN SOLEA, LIMASSOL, CYPRUS (IN PROGRESS)
MAINTENACE OF THE PUMPS AT THE STADIUM OF PEACE AND FRIENDISHIP IN ATHENS
CONSTRUCTION OF THE MEDIUM AND LOW VOLTAGE ELECTRICITY SUBSTATION IN SPETSOPOULA ISLAND
TERMINATION AND CERTIFICATION OF OPTICAL FIBRES OF 8 FIBRES AT THE FACILITY FOR THE PRODUCTION OF FEED “NEUVO” IN SCHIMATARI IN THE DISTRICT OF VIOTIA
2018
REPAIRS OF THE ELECTROMECHANICAL EQUIPMENT AT THE WASTEWATER TREATMENT PLANT IN THASOS
ELECTROMECHANICAL WORKS AT THE VASILIKOS POWER STATION, PHASE IV, UNIT 5 OF THE COMBINED CYCLE GAS TURBINE PLANT, CYPRUS
2017
UPGRADE OF THE POWER COLLECTION SYSTEM AT THE ACCOMONDATION CENTRE IN ELEONAS
DESIGN, SUPPLY AND INSTALLATION OF THE ODOUR TREATMENT SYSTEM FOR THE PUMPING STATION “H”, LIMASSOL, CYPRUS
2016
ELECTRICAL CONSTRUCTIONS FOR THE LIQUEFIED NATURAL GAS (LNG) IMPORT AND RE-GASIFICATION FACILITY IN DELIMARA, MALTA
CONSTRUCTION OF THE NEW FIRE FIGHTING SYSTEM AND DISMANTLING OF THE OLD ONE AT THE “INTERSPORT” STORE IN THESSALONIKI
ELECTROMECHANICAL WORKS AT THE WASTEWATER TREATMENT PLANT IN ADDIS ABABA, ETHIOPIA
CONSTRUCTION OF AN IMPERMEABLE LAGOON OF 25.000 m3 CAPACITY FOR THE TEMPORARY STORAGE OF RAW LEACHATES AND CONNECTION TO THE PROCESSING UNIT OF LEACHATES IN THE LOCATION “KLEFTIKA-ERITHRA KAMELI” IN THE AGGLOMERATION OF MAVRORACHI OF THE LOCAL COMMUNITY OF KARTERA, IN THE MUNICIPALITY OF LAGADA IN THE NORTH THESSALONIKI – ELECTROMECHANICAL WORKS
ELECTRICAL WORKS FOR THE LIGHTING, GROUNDING AND FIRE DETECTION SYSTEM OF DELIMARA’S LNG REGASIFICATION TERMINAL IN MALTA
2015
OPERATION AND MAINTENANCE AT THE LANDFILL IN PAPHOS
UPGRADE INSTALLATIONS OF THE FIRE FIGHTING SYSTEM IN THE “LEROY MERLIN” STORE IN PIREOS AVENUE – REPLACEMENT OF THE FORMER SYSTEM AND REINSTALLATION OF THE NEW ONE
ELECTROMECHANICAL WORKS FOR THE CONSTRUCTION OF 7 WASTEWATER TREATMENT PLANTS IN ETHIOPIA
2014
ELECTROMECHANICAL WORKS AT THE WASTEWATER TREATMENT PLANT IN FERES
RESTORATION OF THE SITE FOR THE UNCONTROLLED DISPOSAL OF WASTE IN PAPHOS, CYPRUS
2013
SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATE OUTPUT OF 1009,80KWp IN STABLE SUPPORT SYSTEM IN GIURGIU, ROMANIA
SUPPLY AND INSTALLATION OF ELECTROMECHANICAL EQUIPMENT IN THE PREFABRICATED (compact) WASTEWATER TREATMENT PLANT IN MONODRI IN THE MUNICIPALITY OF KYMI – ALIVERI
MAINTENACE AND SMOOTH OPERATION SUPERVISION OF THE PHOTOVOLTAIC FACILITY OF 499,80 KW POWER IN THE LOCATION “PERDIKOULA”, MUNICIPALITY OF LIVADIA (IN PROGRESS)
INSTALLATION FOR THE REMOVAL OF MANGANESE, IRON OXIDE AND OPACITY OF POTABLE WATER OF THE PREFECTURE OF VYSSA, MUNICIPALITY OF ORESTIADA
DAMAGE RECTIFICATIONS OF THE WATER SUPPLY SYSTEM IN THE MUNICIPAL COMMUNITY OF PSACHNA AND THE LOCAL COMMUNITY OF KASTELLA –NEOTRIVIAS
RESTORATION OF THE FIRE FIGHTING SYSTEM IN THE IKEA IN THESSALONIKI (CONSTRUCTION OF THE SYSTEM OF FIRE CABINETS WITH HORSE RACK, SPRINKLERS AND FIRE FIGHTING PUMPS)
OPERATION, MAINTENANCE AND SUPERVISION OF THE PHOTOVOLTAIC INSTALLATION OF RATED OUTPUT 499,80 KW IN THE LOCATION “PERDIKOULA – AG.ATHANASIOS” OF THE MUNICIPALITY OF LIVADEIA, PREFECTURE OF VIOTIA
REPAIR OF THE LIFTING, SCREENING, SETTLING AND DRYING UNITS ΑΤ THE WASTEWATER TREATMENT PLANT IN ALIVERI
SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATE OUTPUT 1009, 80KWP IN STABLE SUPPORT SYSTEM, IN THE TOWN GIURGIU, ROMANIA
CONSTRUCTION OF THE HYDRAULIC SYSTEM MADE OF HDPE Φ160-315 mm IN THE REFINERY IN AGIOI THEODOROI
MAINTENACE AND SMOOTH OPERATION SUPERVISION OF THE PHOTOVOLTAIC FACILITY OF 999,06 KW POWER IN GIURGIU, ROMANIA (IN PROGRESS)
ELECTROMECHANICAL WORKS, PLANTING, INSTALLATION OF GEOSYNTHETIC MATERIALS (GCL, GEOTEXTILES) FOR THE RESTORATION PROJECT AT THE LANDFILL IN PAPHOS
SUPPLY AND INSTALLATION OF INTER-CONNECTED PHOTOVOLTAIC SYSTEMS WITH RATED OUTPUT OF 67,000 KWp IN STABLE SUPPORT SYSTEM IN THE LOCATION “GOULIERI 1” AND “GOULIERI 2” IN THE LOCAL COMMUNITY OF KAVALLOURI, MUNICIPAL SECTION OF ESPERIES, MUNICIPALITY OF KERKYRA, REGION OF IONIAN ISLANDS
CONSTRUCTION OF A LANDFILL SITE AT THE INTEGRATED WASTE MANAGEMENT FACILITY OF NORTH-EAST ATTICA AT THE LOCATION “MAVRO VOUNO GRAMMATIKOU”
2012